Stockton Mine – Earth dam and stormwater sump

June 12, 2023

The earth dam and stormwater containment sump constructed by Doug Hood Mining Ltd (DHML) at Stockton Mine are complete. With a final crest level of RL737m, the 610,000 bcm dam embankment is 30 metres high. Excavation of the mine...Read more

Stockton Mine – Fines retention dam

August 31, 2020

In mid 2019 Doug Hood Mining Ltd was tasked with constructing a fines retention dam for BT Mining at Stockton Coal Mine. The dam embankment will require approximately 500,000 m3 of drilled and blasted bulk material excavated with an EX1900 primarily...Read more

Stockton Mine – McCabes, Cypress & EX1900

January 9, 2020

EX1900 production excavator on the move. McCabes is a group of coal bearing and mined out blocks onto which a coal fines storage structure, haul road and stormwater sump will be built. Cypress is a coal block requiring overburden...Read more

ADT fleet renewal to reinforce West Coast contract mining services

August 8, 2019

Our contract mining fleet at Stockton Mine gets another two new Volvo A45G articulated dump trucks: #T76 built January 2019, #T77 built March 2019. This will bring our holding of A45Gs to four. Pre-delivery mine specification checks. Ready for...Read more

Stockton Mine SN14 overburden stripping contract

May 10, 2019

In early 2018 Doug Hood Mining Ltd was awarded the contract to strip 1.0 million bcm of overburden from the SN14 block at Stockton Mine. The volume was increased in late 2018 to 1.5 million bcm extending work to mid-2019. This work utilised 40, 120...Read more

High quality coking coal – Strongman goes opencast with Doug Hood Ltd (Contractor Mag – March 2002)

February 28, 2019

In a blast from the past the following is an article from Contractor magazine – March 2002 highlighting our previous work at Strongman 2 opencast coal mine just below the ridge separating Rapahoe and Blackball and down-range of Pike River. ...Read more

Stockton Mine A18 earth dam embankment lift

December 11, 2017

In early 2017 we commenced earthworks at Stockton Mine to raise the height of the A18 earth dam embankment to increase the dam’s storage capacity. This work has been seasonal due to compaction and earthmoving being sensitive to moisture...Read more

Stockton Mine contracts completed

September 18, 2015

Stockton Mine on the West Coast of the South Island was the home of Doug Hood Mining Ltd for 7½ years. Saturday 31st July 2010 saw the completion of a plant hire arrangement between Doug Hood Mining and the Stockton Alliance, and the conclusion of...Read more

Escarpment Mine project

September 15, 2015

Doug Hood Mining worked with Bathurst Resources at the Escarpment Mine project near Westport to construct the initial site infrastructure required prior to the commencement of large scale mining. Activity on site, halted by Bathurst in mid 2016...Read more

Reddale Mine – 28 month opencast mining contract

March 17, 2014

In October 2011 Doug Hood Mining Ltd (DHML) was selected by Solid Energy New Zealand Ltd (SENZ) to mine the Reddale coal resource. Commencing November 2011 the contract ran for 28 months, concluding February 2014 when SENZ went owner-operator. The...Read more